Monday, June 24, 2013

Updates and Advancements at Lendon

We have a few new advancements to report.  The first advancement is that the pipes have been being put in place under the roads.  They are digging small sections and connecting the pipes to run throughout the Lendon properties.  This means we will soon have utilities strung through the site and then development will really take off.  The second thing to report is that the trench that was dug out is now completely refilled with new dirt and has left little trace that it was ever there.  The folks at http://imapapps.com have provided some more professional pictures so you can see the development.
One of the connections to the pipes under the dirt

Small section dug up for the new pipes

Overview of the new terrain

This is where the trench used to be

Looking over the trench remains at the commercial area of the site

No comments:

Post a Comment